In a construction landscape that has seen costs significantly rise over the last 4 years, our clients wanted to completely change a previously approved scheme to a project that could be built to budget. We worked closely with the contractor in a similar method to a design and build contract to make sure that what was designed could be built within the Client’s budget.
Unlike the previously approved scheme, this new scheme converted the existing building, housing the café, children’s bouldering room, wash facilities and back of house areas. Two new separate buildings were then proposed to house the bouldering and climbing activities individually. These new buildings are linked together via covered walkways.