Rural barnsted development

CROE Architects were appointed to investigate the development potential of an existing group of agricultural barns consisting of four individual barns in different styles, both old and new located within the Green Belt.

After completing the survey of the existing buildings, we proceeded with a feasibility study looking at the unit mix and areas that would comply with various planning policies. Barns within rural settings are required to go through a planning route called prior approval, with certain conditions being met before proceeding with further planning applications.

Once Prior approval was granted, we then set about adjusting them, splitting them up, and adding extra area where possible. Now this future development will consist of 5 individual homes all consisting of 4-5 generous bedrooms with ample living space.

Planning permission was granted back in 2022, and we are now setting about clearing the conditions of the planning decision before starting the major detailing and construction packages.

While the process is long and often stuck in the planning system for months, it does show that if used correctly, you can get planning permission for interesting homes in the green belt. These new homes respect the existing building fabric, provide modern layouts and connect the internal space to the surrounding countryside.

Location

Bedfordshire

Client

Private

Services

Concept, planning

Status

Due for completion 2025